Field notes
How this site was researched
Every claim on this site is taken from a named official Tower Bridge page, or from a named photograph file. A few official figures that do not quite line up are kept off the main pages, and recorded here.
What was used
The spine of the site is the official Tower Bridge website: About us, Bridge Lift times, Top facts of Tower Bridge, How does Tower Bridge work?, and the construction timeline. Each page is named where it is used, and listed again on the sources page.
Notes kept off the visible story pages
The About page says the Bridge “is raised around 850 times each year.” The Bridge Lift times page says it “lifts around 500 times a year.” Those two official figures are not combined, and neither is treated as a correction of the other. Visible pages talk instead about the legal duty to lift, the first year’s “over 6,000” openings, the later “few hundred” a year, and the record of 64 lifts in a single day.
The committee recorded a cost of £1,184,000. The same official timeline adds that, with repairs to wharves, compensation and the completion of contracts, “the true cost of the Bridge was probably closer to £1.6 million.” Visible pages use the recorded committee figure, and do not settle the larger estimate as a hard total.
The facts page gives the crests as almost 63m above road level and the central span as almost 66m. The timeline gives the walkways as 42m above the river and 61m between the Towers. Those are different measurements, of different things, and are not added or averaged.
Photographs
Twelve pictures are used, each licence-checked on its source page. The opening-day image is a published print, not a modern photograph, and the ships in it are not identified as the cutter Daisy. CC BY-SA images are used on the website only, and are not placed in the typographic PDFs.
Keep exploring
Enjoyed the Bridge?
No pop-ups. No intrusive advertising. Just interesting stuff. A little support helps the next landmarks site get built.